In the dynamic environment of project execution, change is inevitable. Despite the best efforts to plan every activity and resource, unforeseen factors such as market shifts, design revisions, or resource constraints can alter a project’s trajectory.
Change control is the structured process that enables project teams to manage these deviations systematically, ensuring that modifications to cost, scope, or schedule are assessed, approved, and implemented without derailing the project’s budget and timeline. It is all about maintaining control once the project baseline has been established.
The Change Control Process
Once the project baseline covering scope, schedule, and budget is approved, the challenge lies in keeping track of the baseline while managing inevitable change. The change control process provides a framework for evaluating, approving, and tracking all modifications changes that occur during execution.
It ensures that every proposed change is justified, documented, and aligned with the project’s strategic goals, while also continuously monitoring if these aspects are not part of contractual agreements already. An effective change control process typically includes 6 key steps: identification, documentation and notification, evaluation, review and approval, implementation, and closure.
Identification of change
The first step in change control is recognizing if, when and where change is needed. This could stem from design errors, scope adjustments, unforeseen site conditions, or stakeholder requests. During project execution, it is critical for teams to have clear communication channels, tools and defined roles so that potential changes are identified and reported early. Proactive identification prevents small issues from escalating into major disruptions later in the project lifecycleexecution.
Documentation and notification of change
Once a potential change is identified, it must be properly recorded. Documenting the change request is essential for maintaining traceability and accountability throughout the project. This documentation typically includes a description of the change, the reason it is being requested, and its potential implications, if already known at that point in time. Without structured documentation, changes can go untracked, leading to cost overruns or schedule delays that are difficult to justify.
Evaluation of change and impact assessment
After documentation, each change request must be evaluated in detail. This step involves analyzing its impact on cost, schedule, quality, and risk. Project control professionals use estimating solutions, forecasting models and performance data to estimate qualify and quantify the implications of proposed changes.
For example, adding new work packages may increase labor hours and procurement costs, while delaying a milestone can affect project cash flow for contractors. An objective assessment ensures that decision-makers understand the full consequences before approval.
Change review and approval
Not every proposed change should move forward. During the review and approval stage, the change control board or an equivalent decision-making body evaluates whether the change aligns with project goals, client expectations, and available resources. Furthermore, change requests that involve scope already included in contractual agreements must be carefully evaluated to avoid redundancy and ensure alignment with contractual obligations.
Approved changes are formally authorized and integrated into the project plan, while rejected ones are recorded with clear justification. A transparent approval process helps maintain stakeholder trust and project governance.
Implementation of approved change
Once a change is approved, it transitions from plan to action. The implementation phase involves executing the approved change and updating the revised baseline including cost, schedule, and scope. Project teams must communicate the approved changes across departments to ensure alignment between planning, engineering, procurement, and field execution. Proper baseline management ensures that progress reporting and performance analysis remain accurate.
Change monitoring and closure
After implementation, it is vital to monitor the change to ensure it delivers the expected benefits without introducing new risks. This involves tracking performance metrics, verifying outcomes, and closing the change request once all actions are complete. Monitoring also provides valuable feedback to improve future change control practices and avoid recurring issues. A well-documented project closure phase enhances transparency and supports continuous improvement in project management.
Benefits of Change Control
A robust change control process in project management brings several strategic advantages:
- Improved cost and schedule predictability: Changes are assessed for impact before execution, reducing the risk of budget overruns and delays.
- Enhanced accountability: Documented approvals ensure all stakeholders understand why and how changes are made.
- Better and faster decision-making: Objective data supports informed approval or rejection of change requests.
- Increased stakeholder confidence: Clients and partners are assured that every change is managed professionally and transparently.
In short, effective change control strengthens project governance and maintains the integrity of the approved baseline throughout execution.
Change Control Challenges and Solutions

Even with structured procedures, implementing change control during execution can be challenging. Below are some common obstacles and how project professionals can overcome them.
Challenge 1: Incomplete or delayed change identification
In fast-moving projects, potential changes can go unnoticed until they have already impacted cost or schedule.
Solution: Implement real-time project controls and establish a culture of continuous monitoring. Project controls software like Cleopatra Enterprise integrate cost, schedule, and risk data, helping teams detect deviations early and raise change requests promptly.
Challenge 2: Insufficient data for impact assessment
Project teams often lack the data required to assess the full cost or time implications of a change.
Solution: Centralized project data environments, supported by integrated cost management software, provide the historical and real-time data necessary for accurate evaluations. Cleopatra Enterprise helps bridge this gap by connecting estimating, cost control, and forecasting systems to support informed decision-making.
Challenge 3: Poor communication and approval delays
When change requests are reviewed by multiple stakeholders, approvals can become bottlenecks.
Solution: Standardize workflows and automate notifications for change approvals. Digital platforms can streamline collaboration and ensure that decision-makers receive all necessary information in a timely manner.
Challenge 4: Difficulty maintaining updated baselines
After approval, implementing the change across systems and updating baselines can be inconsistent.
Solution: Use integrated project control solutions that automatically adjust cost and schedule baselines following approved changes, ensuring all departments work from the same data source.
Effective change control is not just about managing paperwork. It is about maintaining project integrity during execution. By embedding structured processes, real-time data, and collaborative tools, project managers can ensure that every change contributes to project success rather than undermining it.
Inflation is a factor that can quietly erode project budgets long before anyone realizes it. In construction and…
Controlling costs remains one of the toughest challenges in construction projects. Without clear insight into when and where…
Related resources
Project Cost Tracking: A Practical Guide
Effective project cost tracking is essential to staying on budget and making informed decisions. This guide explains how to track costs step-by-step, avoid overruns, and use tools like CPI and EAC to forecast and control spending throughout the project lifecycle.
Read blog article
10 steps to manage your budget when scope changes
As one of the Project Controls Experts at Cleopatra Enterprise, Stephanie Ritchie sees a lot of common mistakes in the field. In this video blog she discusses one of them: being reactive instead of proactive.
Read blog article