Enbridge’s Cost Estimation and Benchmarking Success with Cleopatra
Case Study
Introduction to Enbridge’s Project Controls Needs
As a player in the energy market, Enbridge needed a flexible project controls tool to understand and adjust costs to remain adaptable to ever-shifting energy types and different political atmospheres.
This necessity, in addition to Enbridge’s desire to benchmark their projects to compare the performances on an enterprise-wide scale, made the company look for a reliable alternative to the existing tool with several restrictions.
Using Cleopatra Enterprise, Enbridge has improved cost estimating and implemented benchmarking functionalities, resulting in significant time savings and support in critical business decision-making.
Enbridge’s Prior Challenges
- Aligning cost models to ensure they reflect the most recent project costs
- Knowing how projects perform on an enterprise-wide level
- Understanding and adjusting costs in an ever-changing marketplace
- Easily querying the existing database
- Having flexible & customizable reporting
- Adapting the current software to new asset and project types
Enbridge searched for the ideal tool for almost 2 years to overcome these challenges. After investigating the alternatives, such as modifying the existing third-party software and using other databases, Enbridge decided to use Cleopatra Enterprise.
Results of implementing Cleopatra Enterprise
The solution included:
- Easy to expand and maintain cost models – the frameworks in which all costs are recorded and allocated to the activities
- Ability to capture project information from executed and ongoing projects and benchmark performances
- Multiple Breakdown Structures enabling users to create reports and breakdowns by comparing data of multiple estimates
- Advanced data reporting tools that meet any specific reporting requirements