Case Studies

WesCEF Unlocks Reliable and Accurate Cost Data with Cleopatra
Learn how WesCEF solved their challenges in creating reliable cost databases and benchmarks for estimates in capital projects with Cleopatra Enterprise, achieving greater efficiency, estimate accuracy, and smoother project approvals.
Read case study
Goeldner Consulting Centralizes Cost Data and Enhances Estimating
Read how Goeldner Consulting overcame challenges in managing scattered cost information and enhanced estimating efficiency with Cleopatra Enterprise.
Read case study
SBM Offshore Achieves Data Standardization and Efficiency with Cleopatra
Learn how SBM Offshore tackled data standardization and cost estimating challenges using Cleopatra Enterprise, boosting efficiency.
Read case study
Lyondellbasell Enhances Turnaround Cost Estimation with Cleopatra
Read this case study to find out how LyondellBasell enhanced its cost estimation practices in turnarounds with Cleopatra.
Read case study
Bayer’s Path to Digital and Integrated Cost Estimating
Learn how Bayer transformed its manual estimating process with Cleopatra, achieving digital integration, higher accuracy, and reporting capabilities.
Read case study
Sulzer
Read this case study to learn how Sulzer selected Cleopatra as a centrally managed project controls solution and used it as a foundation to optimize and integrate their cost estimation processes.
Read case study
Enbridge’s Cost Estimation and Benchmarking Success
See how Enbridge used Cleopatra to enhance cost estimating and benchmarking, resulting in saving time and supporting key decisions.
Read case study
Bruce Power
Read this case study to learn how Bruce Power utilized Cleopatra Enterprise to improve their cost estimates.
Read case study
Rijkswaterstaat Enhances Infrastructure Cost Estimation
Discover how Rijkswaterstaat improved infrastructure cost estimation with Cleopatra, creating an efficient and repeatable estimating process.
Read case study
Abbott Laboratories’ Cost Management Success for New Facilities
Read how Abbott delivered 2 factories and a laboratory using Cleopatra's expert cost control, forecasting, and strategic planning.
Read case study
ITER
Read this case study to learn why ITER selected Cleopatra Enterprise as their advanced cost estimating tool.
Read case study
Sasol Improves Estimating Accuracy and Efficiency with Cleopatra
Discover how Sasol, a global energy and chemical company, streamlined cost estimating processes and achieved time savings using Cleopatra.
Read case study
Heineken Optimizes Production Costs with Cleopatra Estimating
Read this case study to learn how Heineken gained valuable production cost insights with Cleopatra's Estimating solution.
Read case study
aQuaintance
Read this case study to find out how aQuaintance achieved improved cooperation and integration thanks to Cleopatra Enterprise.
Read case study
Heerema Marine Contractors
Read this case study to learn how Cleopatra helped Heerema Marine Contractors perfect the top-level elements of the whole estimating process.
Read case study
Boskalis Optimizes its Estimating Processes with Cleopatra
Learn how Boskalis streamlined its estimating processes and optimized historical data use with Cleopatra to tackle complex offshore projects.
Read case study
Neste Optimizes Turnaround Cost Management with Cleopatra
Discover how Neste optimized turnaround cost management with Cleopatra's software, improving cost control, scope management, and reporting.
Read case study