Over 1,5 million cost items
Based on 2.000+ real-life projects
Globally applicable
Data for conceptual to detailed estimates
The CESK contains cost estimation models to estimate costs and quantities even in early design stages. Equipment models use parameters typically found on equipment lists, complemented with project and locational parameters. Through Cleopatra, CESK equipment models can be linked to your engineering system for streamlined estimating of design.
Detailed estimates are supported by the CESK’s unit rates and smart unit rate assemblies. Material Takeoffs (MTO) or Bill of Quantities (BOQ) be read and estimated by Cleopatra automatically, leveraging the power of Cleopatra’s cost estimating software to speed up your estimating process.
Empowering analytics and reporting
The CESK contains built-in analytics and reporting capabilities. By having standard breakdown structures already included, reporting your estimates has never been easier. It doesn’t matter if you develop your estimate from our unit rate library or by using the equipment cost models, it will always provide in transparency in the cost build-up. This solution ensures a unified, standardized approach to analysis and reporting, assuring consistency in terminology and standardization across all projects. When combined with Cleopatra Enterprise’s project controls software, CESK Data enables teams to move seamlessly from estimating to execution.
Adapting to regional variables
Our cost database stands out by providing support for both metric and imperial units of measurement. Moreover, it considers the distinctive characteristics and productivity metrics of various regions. It incorporates local labor and material costs, location factors, equipment costs, and task-specific hours.
Sourcing trustworthy data
In collaboration with esteemed partners such as Richardson Cost Database and George Fischer Piping Systems, Cleopatra ensures the reliability of its cost database. These partnerships guarantee continuous monitoring and maintenance of data quality, drawing from a wealth of project experiences worldwide. Whether leveraging our standard cost library or third-party data, you benefit from a trustworthy foundation.
Feature Highlights
All our solutions come with their own unique features. This one does too! Explore a brief summary of some of them.
Over 1.5 million cost items
Support estimates from conceptual to detailed
Reliable and up-to-date cost data
Adaptable to location and market conditions
Built-in data analysis features
Completely transparent
What our customers are saying
A ready-to-access cost knowledgebase
A globally used cost and labor norm knowledgebase maintained by our data professionals.
FAQs about CESK Data
-
How is the estimating data developed and maintained?
We develop our CESK estimating data using various methods, such as market research, analyzing historical data, consulting experts, developing cost models, and updating it based on industry standards and trends.
-
Can cost data be used for specific locations, even if the original data is not calibrated for that region?
Yes, you can use cost data for specific locations, even if it’s not calibrated for that region. Adjustments and allowances may be necessary to account for regional differences using local indices, benchmarks, or expert judgement
Related Resources
Infographic
Survey Report: Project Cost Management
Get a list of the most common project cost management problems that we have seen and our proposed solutions to fix them.
Cost Benchmarking in Capital Projects: Definition, Benefits, and Examples
In today’s ever-changing markets, large capital projects face increasing pressure to deliver on time and within budget. Project…
Location factors: The important ingredient in Project Cost Estimation
Before starting to map the location factors, always look for the relevant historical data. Knowledge is the key…
Boskalis Optimizes its Estimating Processes with Cleopatra
Learn how Boskalis streamlined its estimating processes and optimized historical data use with Cleopatra to tackle complex offshore…
Related solutions
Cleopatra covers the entire project life cycle by including functionalities for different project controls disciplines in one advanced system. With centralized data at its heart, Cleopatra ensures continuous improvement of project performance, and successful digital transformation.
Ready to start?
Request a live demonstration and experience the benefits Cleopatra Enterprise can have for your organization.