Whitepapers
Cleopatra Enterprise and Maxgrip announce new partnership that maximizes the performance of turnaround management
Cleopatra & Maxgrip alliance marks a significant step in optimizing Shutdowns, Turnarounds and Outages (STO) management. In the partnership the flagship software of Cleopatra Enterprise will be deployed by MaxGrip consultants who add their deep domain knowledge to optimize results for clients.
Read whitepaper
‘Eager Beaver’ Ko des Bouvrie is curious above all things
āWhat people often think is that cost engineers are budget engineers, but there is much more to themā¦ā ā the quote by Ko des Bouvrie ā the founder of Cost Engineering, who created the company more than 25 years ago together with Chris Hagedoorn. He is 75 years old now, but a big smile on his face showed how much he still enjoys working in his profession as a self-proclaimed āeager beaverā.
Read whitepaper
Testimonial: ITER
Cost Engineering used Cleopatra Enterprise to execute Total Cost Management for the world's largest project: ITER.
Read whitepaper
UniSimĀ® Design Link to Cleopatra Enterprise
Read this blog to learn to Improve CAPEX and OPEX process engineering design by quickly estimating project cost.
Read whitepaper
LyondellBasell Testimonial
Read this blog to learn how LyondellBasell incorporated Cleopatra Enterprise software, for their turnaround operations.
Read whitepaper
Project controls in Cleopatra Enterprise
With Estimating, Project Analysis and Cost Management Cleopatra Enterprise offers a solution which is unique in the market.
Read whitepaper
Cleopatra Enterprise vs. Aspen Kbase
Choosing between Cleopatra Enterprise and Aspen Kbase is a good example of a choice that cannot be made based on specifications alone.
Read whitepaper
The Missing Link: Object Oriented Estimating
Object oriented estimating methodology requires a good understanding of the cost drivers in a project.
Read whitepaper
Cost Management: Excel vs. Dedicated Tools
The added value of dedicated cost management tools - how to notice and act upon early warning signals. Read this white paper to learn more.
Read whitepaper
Improved process design evaluation through enhanced cost analysis integration
In order to remain competitive and maximize business performance, optimum designs must be identified quickly with minimum risk of rework.
Read whitepaper